The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:09.04 06:02
NIGERIA | LAGOS:09.04 07:02
EGYPT | CAIRO:09.04 08:02
UAE | DUBAI:09.04 10:02
SRI LANKA | COLOMBO:09.04 11:32
SINGAPORE:09.04 14:02
ENGLAND | LONDON:09.04 07:02
RUSSIA | MOSCOW:09.04 10:02
CHINA | BEIJING:09.04 14:02
AMERICA | Los Angels:09.03 23:02
AMERICA | New York:09.04 02:02
BRAZIL | San Paulo:09.04 03:02