DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:09.01 08:43

  • NIGERIA | LAGOS:09.01 09:43

  • EGYPT | CAIRO:09.01 10:43

  • UAE | DUBAI:09.01 12:43

  • SRI LANKA | COLOMBO:09.01 14:13

  • SINGAPORE:09.01 16:43

  • ENGLAND | LONDON:09.01 09:43

  • RUSSIA | MOSCOW:09.01 12:43

  • CHINA | BEIJING:09.01 16:43

  • AMERICA | Los Angels:09.01 01:43

  • AMERICA | New York:09.01 04:43

  • BRAZIL | San Paulo:09.01 05:43